HomeHarbin Pulse Precision Technology Co., Ltd.

Harbin Pulse Precision Technology Co., Ltd.

Publish Time: 2025-08-06

Type: Metabolomics


Total Area: 3,600 


Construction Duration: 120 Days


Type: EPC


Project Location: Harbin, Heilongjiang


Extremely cold weather makes design and construction challenging.


Extremely tests job coordination skills.


Design, procurement, and construction are closely linked and coordinated.


Construction Content:


a. Metabolomics R&D Laboratory


b. Independent Medical Laboratory


c. Supporting Office Area and Exhibition Hall


Implementation Content:


a. The project includes the design of specialized laboratories within the scope of the floor plan, supporting installation systems, power systems (strong and weak), water supply and drainage systems, purification and air conditioning systems, comfort air conditioning systems, ventilation systems, fresh air systems, automatic control systems, sample library systems, data center (IT room), infrastructure, centralized air supply systems, temporary storage rooms for waste (including medical waste), fire protection systems, sewage treatment systems, diesel generator rooms, laboratory furniture systems, office areas, and all other decoration and installation work, as well as detailed design drawings required to complete the project.











×