Total Area: 4,220 m²
Type: Cell Preparation and Storage Laboratory
Type: EPC
Construction Duration: 90 days
Project Location: Nanshan District, Shenzhen
Main Project Components:
a. Advanced Cell Manufacturing Technology R&D Platform Laboratory
b. CRO Laboratory
c. Cell Industry Key Materials and Consumables R&D Platform Laboratory
d. Novel Cell and Gene Therapy Technology R&D Platform Laboratory
e. CDMO Cell Manufacturing Workshop (Demonstration) Laboratory
f. Cell Lifecycle Management Platform, Cell Professional Training Center, and Other Supporting Office Spaces
The project includes: design of specialized laboratories within the scope of the floor plan, supporting installation systems, laboratory power distribution and installation systems, laboratory low-voltage electrical systems, laboratory water supply and drainage systems, clean air conditioning systems, standard air conditioning systems, ventilation systems, automatic control systems, cold storage systems, centralized air supply systems, temporary waste storage rooms, fire protection systems, power expansion projects, exhibition hall decoration, and all other decoration and installation work, as well as detailed design drawings required to complete the project.